Prepare project for pipeline takeover: task tracker, UX doc, CLAUDE.md pointers
Adds docs/tasks/ (16 epics + 102 stories converted to task/subtask files with statuses.md as the new status source of truth) and docs/ux-design.md (retrospective design-system reference), and points CLAUDE.md at them. docs/prd.md and docs/architecture.md are kept as BMAD wrote them; the legacy docs/stories/, docs/epics/, docs/qa/gates/ and .bmad-core/ stay in place as historical/traceability records, superseded but not deleted. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
This commit is contained in:
@@ -0,0 +1,21 @@
|
||||
---
|
||||
id: 9
|
||||
title: 9 Design & Branding Implementation
|
||||
status: Ready for Dev
|
||||
date: 2026-09-27
|
||||
---
|
||||
|
||||
## Description
|
||||
|
||||
Implements the full visual design system in its original (Navy+Gold, later superseded) form: color system, typography, logo integration, component styling for buttons/forms/cards/navigation, RTL/LTR layout correctness, responsive design, WCAG AA accessibility, and animations/micro-interactions.
|
||||
|
||||
## Acceptance Criteria
|
||||
|
||||
- [ ] Brand colors consistently applied
|
||||
- [ ] Logo properly integrated throughout
|
||||
- [ ] Typography hierarchy implemented
|
||||
- [ ] RTL/LTR layouts perfect
|
||||
- [ ] Responsive on all breakpoints
|
||||
- [ ] WCAG AA contrast compliance
|
||||
- [ ] Professional, polished finish
|
||||
- [ ] Smooth animations and transitions
|
||||
Reference in New Issue
Block a user