Commit Graph

6 Commits

Author SHA1 Message Date
Naser Mansour 3d1fe40be6 docs: client-approved public-site redesign — PRD 1.4, UX spec v2.0, architecture §6.2, tasks 24-x Ready for Dev
Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
2026-10-31 18:23:02 +02:00
Naser Mansour 690c22395f Replace logo with client-supplied artwork; add Nablus workshop registration form
- public/images/logo.png replaced with the client's professionally-designed
  version, cropped to remove excess background margin (used sitewide via
  logo.blade.php / app-logo.blade.php / app-logo-icon.blade.php)
- New standalone, unlinked registration form at /forms/nablus-workshop for a
  one-off workshop Libra is co-hosting with Smart Business Center, replicating
  a ClickUp form the client previously used but with Libra's own branding.
  Submissions email info@libra.adv.ps and redirect to /about. No nav/footer
  link, no DB storage, no captcha (PRD v1.3).
- Tasks 17 (parent), 17-1 (Mailable + email template), 17-2 (page/route/form)
  taken through product-definition -> task-readiness -> dev-implement -> dev-qa,
  all Done. 11 new tests passing; full suite run clean of new regressions
  (69 pre-existing unrelated failures, documented in docs/tasks/17.md).

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-09-27 23:56:50 +03:00
Naser Mansour 149b3c4e53 complete story 12.6 2026-01-04 02:31:30 +02:00
Naser Mansour 4de3f439b9 complete story 11.4 (documintation updates) 2026-01-03 19:34:05 +02:00
Naser Mansour d69026a8e1 complete story 10.6 2026-01-03 04:03:38 +02:00
Naser Mansour ff83974f4a First commit 2025-12-20 20:26:03 +02:00