Files
libra/docs/tasks/statuses.md
T
2026-10-31 19:23:46 +02:00

8.4 KiB

Task Statuses: Libra

Last synced: 2026-09-27 — all rows marked Done at Naser's instruction (live in production ~1 year) Last synced: 2026-09-27 — added tasks 17, 17-1, 17-2 (Nablus workshop registration form, PRD v1.3) Last synced: 2026-09-27 — 17-2 QA passed (7/7 tests), parent 17 Done; full-suite regression gate: 1723 passed / 69 pre-existing unrelated failures Last synced: 2026-09-28 — 19 QA passed (logo removed, flyer max-h-40 confirmed, 7/7 tests), Done Last synced: 2026-09-28 — 20 QA passed (auth-pattern/bg-background/card/text-body confirmed in compiled CSS and Blade, 7/7 tests), Done Last synced: 2026-09-28 — 21 QA passed (flyer max-h-56 confirmed in Blade and compiled CSS, HTTP 200, 7/7 tests), Done Last synced: 2026-10-31 — added tasks 24, 24-1…24-10 (public-site redesign, PRD 1.4); readiness review same day: 6 task-level fixes, all 11 promoted to Ready for Dev

Last synced: 2026-10-31 — full QA of 24 and 24-1…24-10: every acceptance criterion verified by command or in-browser measurement (both languages, 390/768/1440); four defects found and fixed during QA (sticky nav, hover lift, body font, auth focus colour); full-suite rollup 1767 passed / 35 failed, all in areas the redesign did not touch; all rows Done. Visual fidelity to the mockup was not judged by a human; per-task manual lists in docs/tasks/manual-tests/ are now optional impression checks.

ID Title Status
1 1 Core Foundation & Infrastructure Done
1-1 1-1 Project Setup & Database Schema Done
1-2 1-2 Authentication & Role System Done
1-3 1-3 Bilingual Infrastructure (Arabic/English) Done
1-4 1-4 Base UI & Navigation Done
2 2 User Management System Done
2-1 2-1 Individual Client Account Management Done
2-2 2-2 Company/Corporate Client Account Management Done
2-3 2-3 Account Type Conversion Done
2-4 2-4 Account Lifecycle Management Done
2-5 2-5 Account Creation Email Notification Done
3 3 Booking & Consultation System Done
3-1 3-1 Working Hours Configuration Done
3-2 3-2 Time Slot Blocking Done
3-3 3-3 Availability Calendar Display Done
3-4 3-4 Booking Request Submission Done
3-5 3-5 Admin Booking Review & Approval Done
3-6 3-6 Calendar File Generation (.ics) Done
3-7 3-7 Consultation Management Done
3-8 3-8 Consultation Reminders Done
3-9 3-9 Guest Booking Request Done
4 4 Case Timeline System Done
4-1 4-1 Timeline Creation Done
4-2 4-2 Timeline Updates Management Done
4-3 4-3 Timeline Archiving Done
4-4 4-4 Admin Timeline Dashboard Done
4-5 4-5 Client Timeline View Done
4-6 4-6 Timeline Update Notifications Done
5 5 Posts/Blog System Done
5-1 5-1 Post Creation & Editing Done
5-2 5-2 Post Management Dashboard Done
5-3 5-3 Post Deletion Done
5-4 5-4 Public Posts Display Done
5-5 5-5 Post Search Done
6 6 Admin Dashboard Done
6-1 6-1 Dashboard Overview & Statistics Done
6-2 6-2 Analytics Charts Done
6-3 6-3 Quick Actions Panel Done
6-4 6-4 Data Export - User Lists Done
6-5 6-5 Data Export - Consultation Records Done
6-6 6-6 Data Export - Timeline Reports Done
6-7 6-7 Monthly Statistics Report Done
6-8 6-8 System Settings Done
6-9 6-9 Legal Pages Editor Done
6-10 6-10 Audit Log Viewer Done
7 7 Client Dashboard Done
7-1 7-1 Client Dashboard Overview Done
7-2 7-2 My Consultations View Done
7-3 7-3 My Cases/Timelines View (Dashboard Integration) Done
7-4 7-4 My Profile View Done
7-5 7-5 New Booking Interface Done
7-6 7-6 Booking Limit Indicator Done
8 8 Email Notification System Done
8-1 8-1 Email Infrastructure Setup Done
8-2 8-2 Welcome Email (Account Created) Done
8-3 8-3 Booking Submitted Confirmation Done
8-4 8-4 Booking Approved Email Done
8-5 8-5 Booking Rejected Email Done
8-6 8-6 Consultation Reminder (24 Hours) Done
8-7 8-7 Consultation Reminder (2 Hours) Done
8-8 8-8 Timeline Update Notification Done
8-9 8-9 Admin Notification - New Booking Done
8-10 8-10 Admin Notification - System Events Done
9 9 Design & Branding Implementation Done
9-1 9-1 Color System Implementation Done
9-2 9-2 Typography System Done
9-3 9-3 Logo Integration Done
9-4 9-4 Component Styling - Buttons Done
9-5 9-5 Component Styling - Forms Done
9-6 9-6 Component Styling - Cards & Containers Done
9-7 9-7 Navigation & Footer Styling Done
9-8 9-8 RTL/LTR Layout Perfection Done
9-9 9-9 Responsive Design Implementation Done
9-10 9-10 Accessibility Compliance Done
9-11 9-11 Animations & Micro-interactions Done
10 10 Brand Color Refresh Done
10-1 10-1 Core CSS Theme Update Done
10-2 10-2 Blade Component Color Migration Done
10-3 10-3 Email Template Color Update Done
10-4 10-4 PDF Template Color Update Done
10-5 10-5 Logo and SVG Assets Update Done
10-6 10-6 Documentation Update Done
11 11 Guest Booking Done
11-1 11-1 Database Schema & Model Updates Done
11-2 11-2 Public Booking Form with Custom Captcha Done
11-3 11-3 Guest Email Notifications & Admin Integration Done
11-4 11-4 Documentation Updates Done
12 12 Branding Refresh (Logo + Color Scheme) Done
12-1 12-1 Logo Asset Deployment and CSS Layout Updates Done
12-2 12-2 Core CSS Theme Update - Dark Charcoal & Warm Gold Palette Done
12-3 12-3 Blade Component Color Migration - Dark Charcoal & Warm Gold Done
12-4 12-4 Email Template Color Update - Dark Charcoal & Warm Gold Done
12-5 12-5 PDF Template Color Update - Dark Charcoal & Warm Gold Done
12-6 12-6 Brand Documentation Update - Dark Charcoal & Warm Gold Done
13 13 Authentication Pages Design Enhancement Done
13-1 13-1 Language Toggle Visibility Enhancement Done
13-2 13-2 Auth Layout Split Design Update Done
13-3 13-3 Subtle Background Pattern Implementation Done
13-4 13-4 Auth Pages Migration to Split Layout Done
13-5 13-5 Visual QA and Refinement Done
14 14 Home Page Redesign Done
14-1 14-1 Hero Section Implementation Done
14-2 14-2 About Section with Lawyer Profile Done
14-3 14-3 Services Section Done
14-4 14-4 Values Section Done
14-5 14-5 Latest Posts Section Done
14-6 14-6 Footer Contact Information Update Done
15 15 Potential Clients Management Done
15-1 15-1 Database Schema & Model Setup Done
15-2 15-2 Potential Clients List with Type Filter Done
15-3 15-3 CRUD Operations for Potential Clients Done
16 16 About Us Page Done
16-1 16-1 About Page Layout & Hero Section Done
16-2 16-2 Vision & Mission Section Done
16-3 16-3 Values Section Done
16-4 16-4 Goals Section Done
16-5 16-5 Legal Services Section Done
16-6 16-6 Scholarship Aspiration Section (REMOVED from production 2026-01-11 — do not re-implement) Done
17 17 Nablus Workshop Registration Form Done
17-1 17-1 Registration mailable and email template Done
17-2 17-2 Standalone registration page, form, and submit wiring Done
18 18 Nablus Workshop Form - Image Sizing Fix Done
19 19 Nablus Workshop Form - Remove Logo, Shrink Flyer Further Done
20 20 Nablus Workshop Form - Match Site Background and Card Styling Done
21 21 Nablus Workshop Form - Flyer Size Adjustment Done
22 22 Fix Footer Address - Add Missing Street Name Done
23 23 Fix AdminNotificationService Carbon TypeError Masking Exceptions Done
24 24 Public-Site Redesign (PRD 1.4) Done
24-1 24-1 Public Design Foundation (Stylesheet, Script, Fonts, Layout) Done
24-2 24-2 Navigation and Footer Done
24-3 24-3 Signature Balance Component Done
24-4 24-4 Home Page Sections (Hero to Latest Articles) Done
24-5 24-5 Home Booking Card (Compact Booking and Day Strip) Done
24-6 24-6 Booking Page and Booking Success Done
24-7 24-7 About Page Done
24-8 24-8 Articles and Legal Pages Done
24-9 24-9 Auth Pages Type and Controls Done
24-10 24-10 Redesign Integration Verification Done