Files
libra/docs/tasks/9.md
T
Naser Mansour 7f35297025 Mark all libra tasks Done — confirmed live in production ~1 year
Naser confirmed all remaining QA Review / Draft rows (97 subtasks, 16
parent rollups) are done in substance: the site has been in production
for roughly a year. Overrides the conservative QA-Review/Draft mapping
from the prior takeover commit (0f9d12c) at his explicit instruction.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-09-27 22:04:04 +03:00

22 lines
721 B
Markdown

---
id: 9
title: 9 Design & Branding Implementation
status: Done
date: 2026-09-27
---
## Description
Implements the full visual design system in its original (Navy+Gold, later superseded) form: color system, typography, logo integration, component styling for buttons/forms/cards/navigation, RTL/LTR layout correctness, responsive design, WCAG AA accessibility, and animations/micro-interactions.
## Acceptance Criteria
- [ ] Brand colors consistently applied
- [ ] Logo properly integrated throughout
- [ ] Typography hierarchy implemented
- [ ] RTL/LTR layouts perfect
- [ ] Responsive on all breakpoints
- [ ] WCAG AA contrast compliance
- [ ] Professional, polished finish
- [ ] Smooth animations and transitions