Files
libra/docs/tasks/1.md
T
Naser Mansour 7f35297025 Mark all libra tasks Done — confirmed live in production ~1 year
Naser confirmed all remaining QA Review / Draft rows (97 subtasks, 16
parent rollups) are done in substance: the site has been in production
for roughly a year. Overrides the conservative QA-Review/Draft mapping
from the prior takeover commit (0f9d12c) at his explicit instruction.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-09-27 22:04:04 +03:00

843 B

id, title, status, date
id title status date
1 1 Core Foundation & Infrastructure Done 2026-09-27

Description

Establishes the foundational Laravel 12 application: authentication with Admin/Client roles via Fortify, full bilingual (Arabic/English) infrastructure with RTL/LTR layout switching, and the base UI/navigation shell that every later epic builds on.

Acceptance Criteria

  • Laravel 12 project configured and running
  • Database schema designed and migrations created
  • Fortify authentication working (login only, no self-registration)
  • Admin and Client roles implemented with proper authorization
  • Bilingual infrastructure (Arabic primary, English secondary)
  • RTL/LTR layout switching functional
  • Base UI framework with brand colors (Navy #0A1F44, Gold #D4AF37)
  • Navigation system with language toggle