Files
libra/docs/tasks/9.md
T
Naser Mansour 7f35297025 Mark all libra tasks Done — confirmed live in production ~1 year
Naser confirmed all remaining QA Review / Draft rows (97 subtasks, 16
parent rollups) are done in substance: the site has been in production
for roughly a year. Overrides the conservative QA-Review/Draft mapping
from the prior takeover commit (0f9d12c) at his explicit instruction.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-09-27 22:04:04 +03:00

721 B

id, title, status, date
id title status date
9 9 Design & Branding Implementation Done 2026-09-27

Description

Implements the full visual design system in its original (Navy+Gold, later superseded) form: color system, typography, logo integration, component styling for buttons/forms/cards/navigation, RTL/LTR layout correctness, responsive design, WCAG AA accessibility, and animations/micro-interactions.

Acceptance Criteria

  • Brand colors consistently applied
  • Logo properly integrated throughout
  • Typography hierarchy implemented
  • RTL/LTR layouts perfect
  • Responsive on all breakpoints
  • WCAG AA contrast compliance
  • Professional, polished finish
  • Smooth animations and transitions