7f35297025
Naser confirmed all remaining QA Review / Draft rows (97 subtasks, 16
parent rollups) are done in substance: the site has been in production
for roughly a year. Overrides the conservative QA-Review/Draft mapping
from the prior takeover commit (0f9d12c) at his explicit instruction.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
721 B
721 B
id, title, status, date
| id | title | status | date |
|---|---|---|---|
| 9 | 9 Design & Branding Implementation | Done | 2026-09-27 |
Description
Implements the full visual design system in its original (Navy+Gold, later superseded) form: color system, typography, logo integration, component styling for buttons/forms/cards/navigation, RTL/LTR layout correctness, responsive design, WCAG AA accessibility, and animations/micro-interactions.
Acceptance Criteria
- Brand colors consistently applied
- Logo properly integrated throughout
- Typography hierarchy implemented
- RTL/LTR layouts perfect
- Responsive on all breakpoints
- WCAG AA contrast compliance
- Professional, polished finish
- Smooth animations and transitions